The Proseal of the fuel cap and drain is cured, next step is inserting the ribs.
Continue reading “New left fuel tank Proseal session 3”
New left fuel tank Proseal session 2
The work continued with the fuel drain and fuel cap.
Continue reading “New left fuel tank Proseal session 2”
New left fuel tank Proseal session 1
After preparing the parts I continued with the first Proseal session.
Continue reading “New left fuel tank Proseal session 1”
Matchdrilling fuel tank skin
After making sure the left fuel tank was in the proper position and secured with many cleco’s it was time to match drill the holes with the holes in the main spar.
Continue reading “Matchdrilling fuel tank skin”
Building another fuel tank
Parts for building a new left fuel tank arrived.
Continue reading “Building another fuel tank”
Test fit fuel tank
Before closing the fuel tank I did an test fit, unfortunately there is some misalignment.
Continue reading “Test fit fuel tank”
Fuel tank test with Avgas
Before closing the fuel tank I wanted to know if there are any leaks, so I did a test with Avgas.
Continue reading “Fuel tank test with Avgas”
Fixating inside leading edge ribs
The inboard leading edge ribs needed fixation before attaching the fuel tank.
Continue reading “Fixating inside leading edge ribs”
Leading edge skin right wing
Last week I worked on the leading edge skin of the right wing which was more work than anticipated.
Continue reading “Leading edge skin right wing”
Leading edge skin and ribs preparation
Before I can add the leading edge skin of the right wing some minor tasks needed to be done.
Continue reading “Leading edge skin and ribs preparation”