Installation of the conduit and wires for the landing, taxi and navigation lights.
Continue reading “Electrical conduit and wires right wing”
Category: Electrical / Plumbing
Wires checked and labeled
With help of a multicore cable tester I identified and checked all wires in the left wing for the nav, landing and taxi lights. Next I marked them with Dymo heat shrink tubes.
Continue reading “Wires checked and labeled”
New pitot tube
Garmin replaced my pitot tube because it did not pass the leak test; great service from Garmin! So I could redo the installation.
Continue reading “New pitot tube”
Pitot installation fix and new leak test
I fixed the leak at the flare, moved to Nyloseal and did another leak test with a digital meter.
Continue reading “Pitot installation fix and new leak test”
Leak test pitot tube
Spread over the last days I did some leak testing of the pitot tube.
Continue reading “Leak test pitot tube”
Pitot tube installation part 2
I received the 3D-printed spacer and continued with the installation of the pitot.
Continue reading “Pitot tube installation part 2”
Pitot tube installation part 1
I prepared for the pitot installation.
Continue reading “Pitot tube installation part 1”
Pitot tubes and wires
Now that the wires for the lights are ready I started with the wires and plumbing of the heated Garmin pitot.
Continue reading “Pitot tubes and wires”
Conduit left wing
After all the brackets were dry I could start installing the conduit and wires.
Continue reading “Conduit left wing”
Conduit brackets 2
Another bracket was needed to transform from the 16 mm conduit to the 13 mm conduit.
Continue reading “Conduit brackets 2”