I received the new eyebolts from TAF because non of my original eyebolts were okay according to SB0020. With the new eyebolts I could install the pushrods.
Continue reading “Eyebolts and pushrods”
Category: 90 – Service Bulletin
Verify eyebolts according SB0020
Recently SB0020 was released which requires verifying all eyebolts.
Continue reading “Verify eyebolts according SB0020”
Fuselage bottom skin preparation
Several tasks were done to the fuselage bottom skin.
Continue reading “Fuselage bottom skin preparation”
SB0018 heat shrink
The 6:1 heat shrink arrived so I thought to finish SB0018.
Continue reading “SB0018 heat shrink”
SB0018 inspection rudder cables oval sleeves
Since the rudder cables are not yet installed, it’s a good moment to execute SB0018.
Continue reading “SB0018 inspection rudder cables oval sleeves”
Test fit RF rib 6-9
Between the inventory I was looking forward to assembling some parts, so I started with ribs 6 to 9 of the rear fuselage.
Continue reading “Test fit RF rib 6-9”
Rivet both fuel tanks to the wing
This is a milestone in building the wings because when the wings are attached to the wing the jigs can be removed.
Continue reading “Rivet both fuel tanks to the wing”
SB0014
Executing SB0014 and replacing the aluminium rivets with stainless steel rivets.
Continue reading “SB0014”
Rivet top skins right wing
Finally it’s time to close the right wing.
Continue reading “Rivet top skins right wing”
Avdel rivet test for SB0014
I received the stainless steel rivets for SB0014 and did some tests with them before shooting them into the main spar.
Continue reading “Avdel rivet test for SB0014”