New bushings arrived to improve the movement of the nose gear.
Continue reading “New nose gear bushings”
Category: Landing gear
Main wheels installed and first touch down
A big milestone, after installing the axles and wheel the airplane touched down on the mains for the first time.
Continue reading “Main wheels installed and first touch down”
Axle spacer / toe alignment 3
During test-fitting one of the axles, a not so nice discovery was made.
Continue reading “Axle spacer / toe alignment 3”
Balance main wheels
Like the nose wheel the main wheels were balanced.
Continue reading “Balance main wheels”
Main gear toe alignment 2
Re-measuring the toe-in/out after final installation of the main gear with shims.
Continue reading “Main gear toe alignment 2”
Main wheels
Disassembling the wheels and installing the inner tubes and tires.
Continue reading “Main wheels”
Main gear installation
Now that the shims are ready the main gear can be installed.
Continue reading “Main gear installation”
Main landing gear shims
Because the steel brackets in the fuselage are wider than the main landing gear, shims were needed.
Continue reading “Main landing gear shims”
Main gear sanding and painting
The main landing gear had some minor issues that were fixed.
Continue reading “Main gear sanding and painting”
Balancing nose wheel
There are many opinions about if balancing the wheels of an small aircraft is required. I decided that it can’t hurt as long as it is guaranteed that they don’t come loose.
Continue reading “Balancing nose wheel”
