The same procedure as on the left side now on the right side to replace angle 25 and angle 4.
Continue reading “Replace right angle 25 and 4”
Category: Center fuselage
Install right slider
Quick task in between to install the right slider.
Continue reading “Install right slider”
Rivet left side skin
Finally time to rivet the left side skin.
Continue reading “Rivet left side skin”
Firewall tasks
Before riveting the side skins some small tasks were required on the firewall.
Continue reading “Firewall tasks”
Cleco new left side skin
Finally time to cleco the new left side skin in position.
Continue reading “Cleco new left side skin”
Miscellaneous before installing the new left side skin
Before installing the new left side skin some minor tasks needed to be completed.
Continue reading “Miscellaneous before installing the new left side skin”
Improved CF-PLT-007
Due to some minor elongated holes in the main-spar-carry-through and installation of 2 bulkhead fittings for the fuel lines I designed an improved version of CF-PLT-007.
Continue reading “Improved CF-PLT-007”
Install new CF-ANG-025 and CF-ANG-004 with doublers
Installation of the new angles and doublers.
Continue reading “Install new CF-ANG-025 and CF-ANG-004 with doublers”
Spacer for RF-CF overlap
6 holes on each side need a spacer to prevent the skin bulging inwards and preventing unnecessary stress on the underlying flanges.
Continue reading “Spacer for RF-CF overlap”
Priming new parts and touch up
It’s still winter in The Netherlands but not too cold today, with help of a small electrical heater the temperature in the paint booth was increased to 15 degrees Celsius to do some priming.
Continue reading “Priming new parts and touch up”