According the manual the holes of the trim servo should be enlarged to accommodate a M3 rivnut, but that leaves only 2 mm edge distance.
Continue reading “Trim servo installation”
Category: Elevator
Elevator composite caps
A lot of work with fiberglass, polyester resin, 2K putty, MS-Polymer seam sealer and 2K epoxy primer to make sure the composite caps fit perfectly.
Continue reading “Elevator composite caps”
Rivet elevator skins part 2
Continued with rivetting the elevator skins.
Continue reading “Rivet elevator skins part 2”
Rivet elevator skins part 1
After the primer dried last night I could continue with the skin, first edge rolling the leading edge and then removing the blue plastic before I mounted the skin with cleco’s.
Continue reading “Rivet elevator skins part 1”
New elevator parts
Recently I receive new parts for the elevator and continued with preparing and priming.
Continue reading “New elevator parts”
New right elevator skin received
Received the replacement skin for the right side of the elevator.
Continue reading “New right elevator skin received”
Test fit the skins of the elevator
Continued with removing the plastic on the rivet lines and test fitting the skin. Unfortunately with some issues.
Continue reading “Test fit the skins of the elevator”
Rivnuts inspection panel
Installed the M4 rivnuts for the trim servo inspection panel.
Continue reading “Rivnuts inspection panel”
Elevator skins prepared and primed
After a couple of busy weeks the skins of the elevator were next.
Continue reading “Elevator skins prepared and primed”
Clearance spar box channel
The spar box channel was leaning on the hinge which needed some more investigation.
Continue reading “Clearance spar box channel”