Hrs: 7

Landing gear brackets

Priming, painting and installing rivnuts.

After sanding and epoxy priming some Mipa black paint (T95) was mixed:

Curing:

Installing M5 rivnuts with JB Weld, holes were upsized to 7 mm:

Thereafter another spray session with black pain and curing for a day:

Nose gear brackets installed: