Hrs: 3

NACA ducts 1

Preparing the NACA ducts for installation.

One of the wrong side skins could be used as a template for drilling the holes:

The ducts need some trimming as well:

Test fit:

Finally a few coats of some thicker 2K epoxy primer:

Some actions for the todo list for these NACA ducts:

  • Painting them white on the inside
  • Drilling a hole in the left one for the OAT sensor (diameter?)
  • Making backing plates or washers to reinforce the backside where the rivets will sit