After all preparations the side skin could be riveted in place.
One surgery to go: gluing (2k epoxy) the washer in place for the 4.8 mm rivet at the joint of the RF and CF:
Perfect alignment of the skin with alternating cleco’s and rivets:
Holes for bulkhead fuel fittings:
Final drilling of the holes in the angle for the forward inside skins: