To match-drill the holes for the main spar carry through without damaging the original holes I designed a drill jig.
Continue reading “Drill jig CAD/CAM”
Month: March 2024
Right side skin work
Some work had to be done before the skin could be test-fitted with cleco’s.
Continue reading “Right side skin work”
Replace right angle 25 and 4
The same procedure as on the left side now on the right side to replace angle 25 and angle 4.
Continue reading “Replace right angle 25 and 4”
Install right slider
Quick task in between to install the right slider.
Continue reading “Install right slider”
Rivet left side skin
Finally time to rivet the left side skin.
Continue reading “Rivet left side skin”
Firewall tasks
Before riveting the side skins some small tasks were required on the firewall.
Continue reading “Firewall tasks”
Cleco new left side skin
Finally time to cleco the new left side skin in position.
Continue reading “Cleco new left side skin”
Miscellaneous before installing the new left side skin
Before installing the new left side skin some minor tasks needed to be completed.
Continue reading “Miscellaneous before installing the new left side skin”
Improved CF-PLT-007
Due to some minor elongated holes in the main-spar-carry-through and installation of 2 bulkhead fittings for the fuel lines I designed an improved version of CF-PLT-007.
Continue reading “Improved CF-PLT-007”
Install new CF-ANG-025 and CF-ANG-004 with doublers
Installation of the new angles and doublers.
Continue reading “Install new CF-ANG-025 and CF-ANG-004 with doublers”