Hrs: 6

Matchdrill new left side skin

Next step is match-drilling the undrilled holes in the new left side skin.

These holes have to be drilled, preferably from the inside:

Used tools:

Drilling in progress, after each new hole a cleco gets inserted:

2 holes needed drilling through the underlying structure:

Done:

Sufficient cleco’s: