After the impossible rivet issue was resolved it was time to rivet the side-rails.
Continue reading “Rivet siderails / missing flute”
Month: February 2023
Conduits in arch 2/2
As expected the double foam layer got loose and did not hold the conduit so I removed the loose pieces of foam and installed ClickBond fasteners to hold the conduit.
Continue reading “Conduits in arch 2/2”