Today’s task was installing the side rails.
Continue reading “Side rails”
Month: August 2022
Paint session
Nothing special, just a couple of hours painting several parts.
Continue reading “Paint session”
Eyebolts and pushrods
I received the new eyebolts from TAF because non of my original eyebolts were okay according to SB0020. With the new eyebolts I could install the pushrods.
Continue reading “Eyebolts and pushrods”
Flap motor installation
Installing rudder cables sleeves and flap motor.
Continue reading “Flap motor installation”
Touch up torque tubes and brackets
Paint and Alodine touch up on the brackets and torque tubes.
Continue reading “Touch up torque tubes and brackets”
Flap and elevator torque tubes
After the control sticks it was time to test fit the flap en elevator torque tubes and make them run with minimum resistance.
Continue reading “Flap and elevator torque tubes”
Control sticks
Before adding more parts to the fuselage it’s better to add the controls. Other builders informed me that some adjustments are needed to make sure the controls move smooth and this is easier now since the center fuselage is quite accessible now.
Continue reading “Control sticks”
Miscellaneous interior
Just a quick session in the workshop.
Continue reading “Miscellaneous interior”
Paint floor 2
The primer was dry so it’s time to spray the dark gray color.
Continue reading “Paint floor 2”
Paint floor 1
Before spraying the dark gray color on the floor a layer of primer was required.
Continue reading “Paint floor 1”