According the build manual you first build the RF, then the CF and thereafter join them together. But this joining is quite a challenge because there are so many stringers, brackets and skins that all need to line up. Instead I’m going to continue section by section; so first the landing gear assembly and thereafter the main spar assembly and firewall.
Continue reading “Connection RF – CF”
Day: July 6, 2022
Elevator AP bracket
Dummy servo and bracket installation.
Continue reading “Elevator AP bracket”