After the ribs, the work for the rear fuselage continued with the longerons.
Continue reading “RF longerons start”
Month: November 2020
RF rib 2
Although the test-fit of rib 2 looked good there an issue with one flange that needed a fix.
Continue reading “RF rib 2”
RF rivet rib 4 / prep and prime rib 3 / test fit rib 2
Work continued with the RF ribs.
Continue reading “RF rivet rib 4 / prep and prime rib 3 / test fit rib 2”
RF rivet rib 5 / prep rib 4 / test fit rib 3
Work continued on the ribs of the rear fuselage.
Continue reading “RF rivet rib 5 / prep rib 4 / test fit rib 3”
RF rivet ribs 6-9 and start with ribs 5 and 4
The primer cured overnight so I could assemble the first component of the fuselage.
Continue reading “RF rivet ribs 6-9 and start with ribs 5 and 4”
Degrease and prime RF rib 6-9
After getting new epoxy primer I could continue with decreasing and priming all parts for rib 6-9 of the rear fuselage.
Continue reading “Degrease and prime RF rib 6-9”
Fuselage kit inventory – 2
I continued with the inventory of the fuselage kit.
Continue reading “Fuselage kit inventory – 2”
RF Rib 6-9 fixes and deburr
TAF came back to me regarding 2 issues, so I could correct them and deburr all parts.
Continue reading “RF Rib 6-9 fixes and deburr”
Test fit RF rib 6-9
Between the inventory I was looking forward to assembling some parts, so I started with ribs 6 to 9 of the rear fuselage.
Continue reading “Test fit RF rib 6-9”
Wingtips fiberglass – 10
The right wingtip needed some more filler to perfectly fit to the wing and I added some reinforcement fiberglass cloth.
Continue reading “Wingtips fiberglass – 10”