Hrs: 6

New left fuel tank Proseal session 1

After preparing the parts I continued with the first Proseal session.

Preparing the stringer:

Peraring ribs 1 and 5:

Sealant done for the stringer:

Sealant done for the tooling holes and rivnuts in ribs 1 and 5: