Before closing the fuel tank I did an test fit, unfortunately there is some misalignment.
Continue reading “Test fit fuel tank”
Month: September 2019
Fuel tank test with Avgas
Before closing the fuel tank I wanted to know if there are any leaks, so I did a test with Avgas.
Continue reading “Fuel tank test with Avgas”
Fixating inside leading edge ribs
The inboard leading edge ribs needed fixation before attaching the fuel tank.
Continue reading “Fixating inside leading edge ribs”
Leading edge skin right wing
Last week I worked on the leading edge skin of the right wing which was more work than anticipated.
Continue reading “Leading edge skin right wing”
Leading edge skin and ribs preparation
Before I can add the leading edge skin of the right wing some minor tasks needed to be done.
Continue reading “Leading edge skin and ribs preparation”
Landing gear cutout
When I received the replacement bottom skin of the right wing I noted that the landing gear cutout was larger than then the skins shipped with the kit. After consulting TAF is was clear that this was an improvement and I had to enlarge the cutout on the left wing as well.
Continue reading “Landing gear cutout”
Fuel tank miscellaneous
While working with tank sealant for SB0014 I did some improvements on the fuel tanks.
Continue reading “Fuel tank miscellaneous”