Hrs: 4

Pitot tube installation part 2

I received the 3D-printed spacer and continued with the installation of the pitot.

3D-printed spacer:

Location of the spacer:

Making the flares:

Flares ready:

Torquing to 30 inch/lbs:

Loctite 577 as sealant for the brass push-in fitting:

Hex-head stainless steel bolts to make it possible to remove the pitot with the mast:

Tubing attached:

Installation of tubes and electrical wires done:

Next is doing the leak test…