Hrs: 4

Skeleton right wing ready

Back from Oshkosh, the torque seal of the AN173 is dry and the skeleton of the right wing can be riveted.

Riveting the ribs of the right wing was identical as for the left wing, no issues.
This time no details photos, I’m to lazy to post them here, should anyone need more info, please let me know.

My wife helped me with this:

Here a photo of the work done: