Back from Oshkosh, the torque seal of the AN173 is dry and the skeleton of the right wing can be riveted.
Continue reading “Skeleton right wing ready”
Month: July 2018
Airventure Oshkosh 2018
The Airventure 2018 in Oshkosh was great.
Continue reading “Airventure Oshkosh 2018”
Right main spar holes
I had to retorque the AN173 bolts to the higher value and found out that the holes were not nicely aligned.
Continue reading “Right main spar holes”
Skeleton left wing ready
All ribs where ready and I could rivet the ribs of the left wing.
Continue reading “Skeleton left wing ready”
Prepare left wing rib 6 and 12
I still had to prepare and prime the new left wing rib 6 and 12.
Continue reading “Prepare left wing rib 6 and 12”
Primed and assembled the left main spar
After the fixes were done I could prime and assemble the left main spar.
Continue reading “Primed and assembled the left main spar”