Continued with the leading edge ribs.
Also prepared the leading edge ribs that are included in the light kit.
With the curved bending pliers I have adjusted the flanges to follow the curvature of the ribs and with a file I have rounded the flanges.
Result after adjusting, filing, deburring, degreasing and priming: