Hrs: 10

Practice kit 2

The second practice kit is more complicated and more tools are needed. This kit is not required when building a Sling2 because it uses mostly pop rivets

2016-06-12 15.55.54

2016-06-04 14.10.48

2016-06-04 14.17.47

2016-06-04 14.40.29

2016-06-04 15.18.04

2016-06-04 15.35.30
Close quarters dimple dies
2016-06-04 15.46.14
Rivet tape
2016-06-04 15.52.00
Back riveting
2016-06-04 16.15.35
Match drill with 12″ drill

2016-06-04 16.40.23

2016-06-04 20.29.39

2016-06-04 20.42.59

2016-06-04 20.58.11
Wooden mold for correct drill angle

2016-06-04 21.38.21

2016-06-04 21.57.23
Tight fit dimpling fixture
2016-06-04 22.23.34
Tungsten bucking bar
2016-06-04 23.05.38
Thin nose yoke
2016-06-04 23.14.12
Difficult to set these last rivets although the thin nose yoke
2016-06-04 23.14.47
3 dents 🙁
2016-06-05 17.35.43
Double flush riveting with custom steel angle backing plate
2016-06-05 19.16.54
Result
2016-06-12 19.38.57
Leading edge rolled with 27 mm broomstick
2016-06-12 19.39.34
Final result