LATTEN.NET
DWG 001 — PRJ-01 · MAIN PROJECT

Building
a Sling 2

Build log of a Sling 2 kit aircraft, from parts to plane: hours, photos and lessons learned. Designed, measured and documented.

LATEST — PRJ-01FROM THE BUILD LOGOPEN BUILD LOG →
  1. Landing gear cover skin
  2. Main gear mounting box shims
  3. Landing gear inspection panel prototype

SIDE PROJECTSOTHER THINGS MEASURED AND TESTED

PRJ-02● ACTIVE

Solar panel analysis

How a conifer shades the workshop roof panels: an interactive shade study through the day.

OPEN SHADE STUDY →
PRJ-03○ COMING SOON

3D filament testing

Ten ASA filaments, one printer, the same two test prints: surface, bridges, overhangs, strength and heat.

COMING SOON

ALL DIMENSIONS IN MM UNLESS OTHERWISE STATED