DWG 001 — PRJ-01 · MAIN PROJECT
Building
a Sling 2
Build log of a Sling 2 kit aircraft, from parts to plane: hours, photos and lessons learned. Designed, measured and documented.
Build log of a Sling 2 kit aircraft, from parts to plane: hours, photos and lessons learned. Designed, measured and documented.
How a conifer shades the workshop roof panels: an interactive shade study through the day.
OPEN SHADE STUDY →Ten ASA filaments, one printer, the same two test prints: surface, bridges, overhangs, strength and heat.
COMING SOONALL DIMENSIONS IN MM UNLESS OTHERWISE STATED